by Tim Surgenor | Nov 10, 2026 | Journal
Short answer: there is no single timeline, because it depends on the size of the building, its condition, the scope of work and any heritage protection. As a broad guide, on a typical villa project, design and permit approval together usually take six to twelve months...
by Tim Surgenor | Nov 9, 2026 | Journal
Short answer: before you sign anything for a property you plan to renovate in Italy, check six things: its legal status, what the rules allow you to change, the ground and the structure, its water, power, drainage and access, what the restoration will really cost, and...